  • Report to show projects that are missing specific tasks

    We would like to have a report that locates projects that are missing specific tasks. I have tried with no success and would appreciate any tips, tricks or direction to help. We use a standard template that has about 30 tasks, the intent is to remove those that you don't need for your project, but...
    Posted to Reports (Forum) by John Tuthill on 02-26-2010
  • Deleting Tasks from Timesheets

    We have a number of projects that were created with extra or unused tasks. As a result many timesheet users have timesheets that have lines and lines of tasks that will never need to have time entered against. How does a timesheet user delete tasks from their timesheet? Thanks.
    Posted to Timesheets (Forum) by EmilyDC on 10-21-2009
  • Re: Limit on number of tasks in a project schedule?

    We have already contacted support, but I was curious if anyone in the user community had experienced an "upper limit" on the number of tasks. With this information, I can better plan for my project managers in developing schedules that conform with the Daptiv environment. Thanks.
    Posted to Tasks/Scheduling (Forum) by seaglass on 07-23-2009
  • Limit on number of tasks in a project schedule?

    Is there any limit to the number of tasks in a project schedule before performance deteriorates? We have had problems with projects containing 800-2000 task items: we have system lockup when deleting tasks and we have problems deleting projects containing this many tasks. We routinely manage schedules...
    Posted to Tasks/Scheduling (Forum) by seaglass on 07-22-2009
  • Why are items being automatically filtered from reports

    I am attempting to create a basic report that displays a few basic fields such as project name, task name, assignee full name, and update notes. Unfortunately, when I run the report, all of the tasks for the project are not displayed. It appears that tasks that have no updates on them are being automatically...
  • Fixing Planned Work for Fixed Duration Tasks

    We have been running into this problem for three years and still don't have an answer. Our organization uses Daptiv to track our ongoing work through Support-type projects. Each year, we set up another batch of these and allocate our staff and have them report effort against a small number of tasks...
    Posted to Tasks/Scheduling (Forum) by fladager on 07-08-2009
  • Billable Tasks

    We initially created a project type with "enable external billing" turned off. We later decided that we wanted to utilize external billing, after the entire project schedule was created. Is there any way to go back and make all of the existing tasks "billable" after having enabled...
    Posted to Tasks/Scheduling (Forum) by davidsm on 05-01-2009
  • Planned Finish update based on Remaining Work

    We are using Transit on our project schedule and our percent complete is based on entering the actual and remaining work (ETC). If the assignee enters in more remaining work then what was planned the planned finish date does not get updated in the schedule. If we sync back to the schedule the remaining...
    Posted to Tasks/Scheduling (Forum) by Rebecca Carmichael on 04-23-2009
  • % Complete values

    Is the % complete displayed in the Project Status pane labeled "Scheduled % Complete" = Effort % complete? Is the % complete displayed on the Projects tab listing labeld [% Complete (Project)] = Duration % complete? Example: Project X - % Complete in the Project Status pane shows 63% Project...
    Posted to Tasks/Scheduling (Forum) by donr on 09-25-2008